Systemair Azerbaijan proudly delivered advanced HVAC solutions for Port Baku Tower 2, a prominent architectural landmark shaping the city’s skyline.
Port Baku Tower 2, Azerbaijan
Systemair Azerbaijan delivered customised solutions that met the project’s high-quality standards, ensuring exceptional indoor air quality throughout the building.
Advanced, energy-efficient systems were designed to withstand Baku’s coastal climate, which includes strong winds, high humidity, and temperature fluctuations.
Systemair Azerbaijan provided holistic support from the early design stages through to project completion, ensuring seamless delivery and performance at every step.
Designed by Chapman Taylor, Port Baku Tower 2 is a 135,000m², 36-floor mixed-use development that enhances the city’s skyline with its sculptural, curving façades and inclined upper levels. This modern skyscraper features high-end office spaces, a grand 16-meter-high ceiling foyer, and a retail and dining podium, making it one of Azerbaijan’s most prominent business hubs.
Securing the contract to supply HVAC solutions for such a high-profile project is a major achievement for Systemair Azerbaijan. It highlights our capability to engineer and deliver advanced, energy-efficient climate control systems that meet the demanding requirements of contemporary architecture.
Given Baku’s unique climate challenges, strong winds, coastal humidity, and temperature fluctuations, Systemair’s expertise in engineering adaptive and sustainable HVAC systems was crucial in meeting the project’s needs. Every unit was carefully selected and configured to align with the highest energy efficiency standards, air purification, and indoor comfort.
Long-term performance was also considered as part of our mission to help Port Baku Tower 2 achieve exceptional indoor environmental quality and our commitment to supporting the client from the early stages through to project completion ensured the building’s ventilation and climate control systems contribute to its iconic status in Baku’s cityscape.
Systemair supplied a comprehensive HVAC package for this landmark project, ensuring optimal ventilation, climate control, and energy efficiency throughout the building.
The complete HVAC package included the following key components:
Automated AHUs – 13 AHUs with humidifier section and automation, providing advanced air handling with smart controls for maximum efficiency
VOClean – kitchen air handling units for superior filtration
Insulated duct fans – delivering precise airflow management for controlled environments
Circular duct fans – optimising air distribution for seamless ventilation
Axial fans – ensuring high-performance airflow for larger spaces
Smoke extract fans – ensuring safety and efficiency in smoke control systems
Lift pressurisation fans – maintaining optimal air pressure in lift shafts
Speed controllers – precise control over fan speed and efficiency
Fan Coils - 1,200 EC fan coils were provided to ensure energy-efficient cooling, precise temperature control, and enhanced indoor comfort
Jet fans – 100+ units were delivered, enhancing ventilation and smoke extraction in parking areas.
Systemair’s reputation for delivering reliable products, supporting certifications, and providing dedicated service helped strengthen our partnership with project stakeholders. Our solutions met the client’s high expectations and contributed to Port Baku Tower 2’s overall sustainability and operational efficiency.
Delivering cutting-edge HVAC solutions that redefine comfort, energy efficiency, and indoor air quality is at the heart of what we do at Systemair Azerbaijan. Our work on Port Baku Tower 2, an iconic landmark in the heart of Baku, highlights our passion for supporting visionary projects with world-class expertise.
Managing Director of Systemair Azerbaijan